5 Simple Techniques For apollo3
Left: In the VAB, the crawler transporter positions by itself below Cellular Launcher 1 in planning for rollout of SA-501 to the launch pad – note the worker during the foreground for measurement comparison.On arrival on the Vertical Assembly Building, Every single phase was inspected within a horizontal posture just before remaining oriented ver